Skip to content
Tokyo Brief東 京 ブ リ ー フJapan's day, wrapped and delivered by morning.

DealsIndustrials

Sekisui House bids ¥2,770 a share for full control of its 20%-owned affiliate

Sekisui House needs holders to tender at least 1,529,300 shares by 13 January 2027 to proceed with its ¥2,770-a-share offer for its 20%-owned affiliate, which the target's board recommends.

Abstract bar of stacked share blocks with a vertical threshold line at the two-thirds point, illustrating a tender offer acceptance minimum.

Sekisui House has launched a tender offer at ¥2,770 per share for Gifu landscape architect Co.,Ltd. (ticker 1438), aiming to make the company a wholly owned subsidiary. The offer runs from 16 November 2026 to 13 January 2027, or 37 business days.

The terms

Sekisui House already holds 655,500 shares, or 20.00% of the target on a fully diluted basis, and treats it as an equity-method affiliate. Warrant holders are offered ¥397,800 per first-series share subscription warrant. There are 120 warrants outstanding, covering 24,000 shares. The share price and the warrant price are separate consideration.

The acceptance floor

The minimum is 1,529,300 shares, or 46.67% on the fully diluted base of 3,277,165 shares. If tenders fall short, Sekisui House buys nothing. There is no maximum: above the floor, it buys everything tendered.

The floor is two-thirds of the voting rights on that base (2,184,800 shares) less Sekisui House's existing 655,500 shares. The target's report explains why two-thirds matters: if Sekisui House fails to acquire every share, a share consolidation under the Companies Act would need a special shareholder resolution. If Sekisui House buys exactly the minimum of 1,529,300 shares, its stake would be 67.40%. That figure uses a different denominator, the 32,415 voting rights recorded at 31 March 2026.

Board position

The target's board resolved on 13 November 2026 to back the offer and recommend that shareholders and warrant holders tender. That is an endorsement, not a completed deal: the offer closes on 13 January 2027 and succeeds only if the minimum is reached.